Skip to content

deps: bump the pip-dependencies group with 12 updates #7

deps: bump the pip-dependencies group with 12 updates

deps: bump the pip-dependencies group with 12 updates #7

Triggered via pull request July 29, 2025 05:02
Status Failure
Total duration 46s
Artifacts

ci.yaml

on: pull_request
pre-commit
28s
pre-commit
Matrix: build-linux
Fit to window
Zoom out
Zoom in

Annotations

6 errors
pre-commit
Process completed with exit code 1.
build-linux (3.11)
Process completed with exit code 5.
build-linux (3.12)
The operation was canceled.
build-linux (3.12)
The strategy configuration was canceled because "build-linux._3_11" failed
build-linux (3.10)
The operation was canceled.
build-linux (3.10)
The strategy configuration was canceled because "build-linux._3_11" failed