deps: bump the pip-dependencies group with 12 updates #7
ci.yaml
on: pull_request
pre-commit
28s
Matrix: build-linux
Annotations
6 errors
|
pre-commit
Process completed with exit code 1.
|
|
build-linux (3.11)
Process completed with exit code 5.
|
|
build-linux (3.12)
The operation was canceled.
|
|
build-linux (3.12)
The strategy configuration was canceled because "build-linux._3_11" failed
|
|
build-linux (3.10)
The operation was canceled.
|
|
build-linux (3.10)
The strategy configuration was canceled because "build-linux._3_11" failed
|