Skip to content

Merge pull request #7 from REChain-Network-Solutions/dependabot/gradl… #24

Merge pull request #7 from REChain-Network-Solutions/dependabot/gradl…

Merge pull request #7 from REChain-Network-Solutions/dependabot/gradl… #24

Triggered via push September 15, 2025 15:06
Status Failure
Total duration 18s
Artifacts

npm-gulp.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (20.x)
Process completed with exit code 254.
build (18.x)
The operation was canceled.
build (18.x)
The strategy configuration was canceled because "build._20_x" failed
build (22.x)
The operation was canceled.
build (22.x)
The strategy configuration was canceled because "build._20_x" failed