Skip to content

fix(l10n): Update translations from Transifex #329

fix(l10n): Update translations from Transifex

fix(l10n): Update translations from Transifex #329

Triggered via push July 8, 2025 02:27
Status Failure
Total duration 58s
Artifacts

behat-sqlite.yml

on: push
Matrix: behat-sqlite
behat-sqlite-summary
4s
behat-sqlite-summary
Fit to window
Zoom out
Zoom in

Annotations

11 errors
behat-sqlite (8.2, master)
Process completed with exit code 1.
behat-sqlite (8.3, stable28)
The strategy configuration was canceled because "behat-sqlite._8_2_master" failed
behat-sqlite (8.3, master)
Process completed with exit code 1.
behat-sqlite (8.3, master)
The strategy configuration was canceled because "behat-sqlite._8_2_master" failed
behat-sqlite (8.1, master)
Process completed with exit code 1.
behat-sqlite (8.1, master)
The strategy configuration was canceled because "behat-sqlite._8_2_master" failed
behat-sqlite (8.1, stable28)
The operation was canceled.
behat-sqlite (8.1, stable28)
The strategy configuration was canceled because "behat-sqlite._8_2_master" failed
behat-sqlite (8.2, stable28)
The operation was canceled.
behat-sqlite (8.2, stable28)
The strategy configuration was canceled because "behat-sqlite._8_2_master" failed
behat-sqlite-summary
Process completed with exit code 1.