Skip to content

[MOD-8198] Introduce INT8 distance functions #650

[MOD-8198] Introduce INT8 distance functions

[MOD-8198] Introduce INT8 distance functions #650

Triggered via pull request December 16, 2024 14:24
@meiravgrimeiravgri
synchronize #560
Status Cancelled
Total duration 9m 47s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

event-pull_request.yml

on: pull_request_target
check-if-docs-only  /  check-only-docs-changed
8s
check-if-docs-only / check-only-docs-changed
spellcheck
7s
spellcheck
Matrix: codeql-analysis / Analyze
coverage  /  Start self-hosted EC2 runner
coverage / Start self-hosted EC2 runner
coverage  /  codecov job
coverage / codecov job
coverage  /  Stop self-hosted EC2 runner
coverage / Stop self-hosted EC2 runner
pr-validation
0s
pr-validation
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 5 warnings
basic tests
Canceling since a higher priority waiting request for 'Pull Request CI-560' exists
basic tests
The operation was canceled.
pr-validation
Process completed with exit code 1.
spellcheck
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
check-if-docs-only / check-only-docs-changed
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
codeql-analysis / Analyze (python)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
codeql-analysis / Analyze (cpp)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
pr-validation
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636