Skip to content

Network fault tolerance #2658

Network fault tolerance

Network fault tolerance #2658

Triggered via pull request October 1, 2025 17:50
Status Failure
Total duration 6m 21s
Artifacts

code-coverage.yml

on: pull_request
Matrix: BuildAndTest-Coverage-Windows
Matrix: BuildAndTest-Coverage
Matrix: AccountCleanup-Cleanup
Fit to window
Zoom out
Zoom in

Annotations

4 errors
BuildAndTest-Coverage-Windows (1.25, windows)
Process completed with exit code 1.
BuildAndTest-Coverage (1.25, linux-fuse2)
Process completed with exit code 1.
BuildAndTest-Coverage (1.25, linux-fuse3)
The operation was canceled.
BuildAndTest-Coverage (1.25, linux-fuse3)
The strategy configuration was canceled because "BuildAndTest-Coverage._1_25_linux-fuse2" failed