Skip to content

Merge branch 'main' into dependabot/pip/pytest-cov-7.0.0 #200

Merge branch 'main' into dependabot/pip/pytest-cov-7.0.0

Merge branch 'main' into dependabot/pip/pytest-cov-7.0.0 #200

Triggered via push February 18, 2026 14:42
Status Failure
Total duration 24s
Artifacts

pylint.yaml

on: push
Matrix: pylint
slack-notification  /  build-failure-slack-notification
slack-notification / build-failure-slack-notification
Fit to window
Zoom out
Zoom in

Annotations

7 errors
pylint (3.12)
Process completed with exit code 1.
pylint (3.13)
The strategy configuration was canceled because "pylint._3_12" failed
pylint (3.13)
Process completed with exit code 1.
pylint (3.11)
The strategy configuration was canceled because "pylint._3_12" failed
pylint (3.11)
The operation was canceled.
pylint (3.10)
The strategy configuration was canceled because "pylint._3_12" failed
pylint (3.10)
The operation was canceled.