Skip to content

migrate to neon database #54

migrate to neon database

migrate to neon database #54

Triggered via push December 16, 2025 11:58
Status Failure
Total duration 13s
Artifacts

ci-client.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (20.x)
Process completed with exit code 1.
build (22.x)
The strategy configuration was canceled because "build._20_x" failed
build (22.x)
Process completed with exit code 1.
build (18.x)
The strategy configuration was canceled because "build._20_x" failed
build (18.x)
The operation was canceled.
build (23.x)
The strategy configuration was canceled because "build._20_x" failed
build (23.x)
The operation was canceled.