Skip to content

Bump actions/setup-node from 5.0.0 to 6.0.0 #108

Bump actions/setup-node from 5.0.0 to 6.0.0

Bump actions/setup-node from 5.0.0 to 6.0.0 #108

Triggered via push October 14, 2025 20:10
Status Failure
Total duration 9m 0s
Artifacts

tests.yml

on: push
Matrix: test
Finalise
0s
Finalise
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Ruby 3.2
Process completed with exit code 1.
Ruby 3.3
The operation was canceled.
Ruby 3.3
The strategy configuration was canceled because "test._3_2" failed
Ruby 3.4
The operation was canceled.
Ruby 3.4
The strategy configuration was canceled because "test._3_2" failed