@gadfort suggestions? |
Beta Was this translation helpful? Give feedback.
-
|
Generally, this is what an sroute should handle. I believe in most cases, the receiving power domain should perform an sroute from the grid to the location(s) of the level shifter(s). If there's a large number of level shifters that make this less practical, then I'm not sure what the best solution would be. |
Beta Was this translation helpful? Give feedback.
-
|
We have a very basic sroute you could try if that is appropriate. |
Beta Was this translation helpful? Give feedback.
-
|
I'd like something like this:
The grid is created with 3 nets: VDDD1V2, VDDD and GNDD. The VDDD1V2 and GNDD straps connect to the power rails in metal1. However PDN supports only 2 nets, 1 for power and 1 for ground. To achieve that in OR:
@gadfort Do you still need a test case? If so I'll upload one to the PII sftp server. |
Beta Was this translation helpful? Give feedback.


Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
In the floorplan script I use
set_voltage_domain -power VDDD1V2 -ground GNDD. I'd like to add a secondary powerVDDDfor the level shifter but only 2 PG nets can be specified.Beta Was this translation helpful? Give feedback.