Skip to content

feat!: Align spec classes with the a2a.proto, removing all backwards c… #1179

feat!: Align spec classes with the a2a.proto, removing all backwards c…

feat!: Align spec classes with the a2a.proto, removing all backwards c… #1179

Triggered via pull request December 16, 2025 16:45
@kabirkabir
synchronize #545
kabir:spec-api
Status Failure
Total duration 7m 31s
Artifacts 1

build-and-test.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (25)
Process completed with exit code 1.
build (17)
The strategy configuration was canceled because "build._25" failed
build (17)
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
surefire-reports-java-25 Expired
337 KB
sha256:7a3ca80336b2ae3e613fdb9a43b8a0ccac2c959eab0d866561850541d2202ccf