Skip to content

Upgrade to eslint 9 #188

Upgrade to eslint 9

Upgrade to eslint 9 #188

Triggered via push November 30, 2025 21:36
Status Failure
Total duration 22s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (20.x)
Process completed with exit code 1.
test (16.x)
The strategy configuration was canceled because "test._20_x" failed
test (16.x)
The operation was canceled.
test (14.x)
The strategy configuration was canceled because "test._20_x" failed
test (14.x)
The operation was canceled.
test (18.x)
The strategy configuration was canceled because "test._20_x" failed
test (18.x)
The operation was canceled.