Skip to content

Phase 5: Observability & Production Readiness #89

@avirtuos

Description

@avirtuos

Phase 5: Observability & Testing (Week 12)

Overview

Add production-grade monitoring, comprehensive test coverage, and operational tooling to ensure WormFS is ready for production deployment with full observability.

Timeline: Week 12 (5 working days)
Goal: Achieve production readiness with complete observability and testing

Success Metrics

  • ✅ >95% metrics coverage of critical paths
  • ✅ <10ms health endpoint latency
  • ✅ 100% critical path test coverage
  • ✅ All performance baselines documented
  • ✅ Complete operational documentation
  • ✅ Grafana dashboards for all components

High-Level Architecture

Observability Stack

┌─────────────────────────────────────────────┐
│            MetricService                    │
├─────────────────────────────────────────────┤
│  ┌──────────────────────────────────────┐  │
│  │      Metrics Collection              │  │
│  │  - Lock-free counters & gauges       │  │
│  │  - Histogram aggregation             │  │
│  └──────────────────────────────────────┘  │
│  ┌──────────────────────────────────────┐  │
│  │      Health Endpoints                │  │
│  │  - /health/live                      │  │
│  │  - /health/ready                     │  │
│  │  - /metrics (Prometheus)             │  │
│  └──────────────────────────────────────┘  │
└─────────────────────────────────────────────┘

┌─────────────────────────────────────────────┐
│         WormValidator Test Framework        │
├─────────────────────────────────────────────┤
│  - Cluster bootstrapping                    │
│  - FUSE client simulation                   │
│  - Chaos testing scenarios                  │
│  - Performance benchmarking                 │
└─────────────────────────────────────────────┘

Implementation Steps

Tasks

  • Step 1: Implement MetricService (Days 1-2)
  • Step 2: Create WormValidator Test Framework (Days 3-4)
  • Step 3: Production Deployment Preparation (Day 5)

Key Metrics to Track

System Metrics

  • Raft: proposals, elections, log size, commit latency
  • FileStore: chunk read/write counts, latency, throughput
  • MetadataStore: query latency, transaction duration
  • Network: bandwidth, connections, message rates
  • Watchdog: check duration, repair success rate

Business Metrics

  • Files created/deleted per second
  • Total storage utilization
  • Erasure coding efficiency
  • Recovery time objectives (RTO)
  • Recovery point objectives (RPO)

Testing Scenarios

WormValidator Tests

  1. Basic Operations: CRUD operations, directory management
  2. Large Files: 100MB+ file transfers
  3. Node Failures: Kill nodes during operations
  4. Network Partitions: Simulate split-brain scenarios
  5. Chaos Testing: Random failures and recoveries
  6. Performance: Throughput and latency benchmarks

Dependencies

  • prometheus - Metrics format
  • axum - HTTP server for endpoints
  • criterion - Performance benchmarking
  • tempfile - Test cluster creation

Related Documentation

Acceptance Criteria

  • All metrics exposed via Prometheus endpoint
  • Health checks respond correctly
  • Test framework validates all scenarios
  • Performance baselines established
  • Grafana dashboards created
  • Operational runbooks complete

Priority: High
Milestone: v1.0.0 - Production Ready

Sub-issues

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or request

    Projects

    No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions