  • Add production-grade monitoring, comprehensive test coverage, and operational tooling to ensure WormFS is ready for production deployment with full observability. Target: Week 12

    Overdue by 2 month(s)
    Due by December 19, 2025
    0/4 issues closed
  • Implement automatic failure detection, data repair, and recovery capabilities to ensure WormFS maintains data integrity and availability even under adverse conditions. Target: Weeks 10-11

    Overdue by 2 month(s)
    Due by December 12, 2025
    0/5 issues closed
  • Implement distributed chunk storage across nodes using erasure coding and gRPC for coordination. Transform WormFS into a fully distributed storage system. Target: Weeks 7-9

    Overdue by 3 month(s)
    Due by November 28, 2025
    3/5 issues closed
  • Enable metadata consistency across 3+ nodes via Raft consensus, transforming WormFS from a single-node to a distributed filesystem with strong consistency guarantees. Target: Weeks 4-6

    Overdue by 4 month(s)
    Due by November 7, 2025
    7/7 issues closed