JDBC Tests With PG AUDIT Enable #572
jdbc-tests-pgaudit-enable.yml
on: schedule
Matrix: run-babelfish-jdbc-tests-with-pg-audit
Annotations
4 errors
|
run-babelfish-jdbc-tests-with-pg-audit (BABEL_4_X_DEV)
Process completed with exit code 1.
|
|
run-babelfish-jdbc-tests-with-pg-audit (BABEL_5_X_DEV)
The strategy configuration was canceled because "run-babelfish-jdbc-tests-with-pg-audit.BABEL_4_X_DEV" failed
|
|
run-babelfish-jdbc-tests-with-pg-audit (BABEL_5_X_DEV)
The operation was canceled.
|
|
run-babelfish-jdbc-tests-with-pg-audit (BABEL_5_X_DEV)
Process completed with exit code 1.
|