Skip to content

Bump actions/checkout from 4 to 6 #27

Bump actions/checkout from 4 to 6

Bump actions/checkout from 4 to 6 #27

Triggered via pull request November 24, 2025 20:42
Status Failure
Total duration 49s
Artifacts

run-tests.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

16 errors
P8.2 - L10.* - prefer-lowest - ubuntu-latest
Process completed with exit code 255.
P8.2 - L10.* - prefer-lowest - ubuntu-latest: vendor/orchestra/canvas/src/Console/NotificationTableCommand.php#L37
Declaration of Orchestra\Canvas\Console\NotificationTableCommand::createBaseMigration() must be compatible with Illuminate\Console\MigrationGeneratorCommand::createBaseMigration($table)
P8.1 - L10.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_10___pr" failed
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_10___pr" failed
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L10.* - prefer-lowest - ubuntu-latest: vendor/orchestra/canvas/src/Console/NotificationTableCommand.php#L37
Declaration of Orchestra\Canvas\Console\NotificationTableCommand::createBaseMigration() must be compatible with Illuminate\Console\MigrationGeneratorCommand::createBaseMigration($table)
P8.2 - L10.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_10___pr" failed
P8.2 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_10___pr" failed
P8.1 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_10___pr" failed
P8.2 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_10___pr" failed
P8.2 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.1 - L10.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_10___pr" failed
P8.1 - L10.* - prefer-lowest - windows-latest
The operation was canceled.