Skip to content

[Release] Cut a new release (7.1.1) or retrigger 7.1.0 #1763

@FrankPortman

Description

@FrankPortman

Right now, 7.1.0 is not actually on Bazel Central Registry due to some issues that came up during that process. Those have since been fixed (I think), but the process either needs to be retriggered, or 7.1.0 should be "yanked" and 7.1.1 released. As it stands, the instructions in the 7.1.0 release are incorrect since 7.1.0 doesn't actually exist on BCR.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions