Skip to content

chore: Adjust build process #15

chore: Adjust build process

chore: Adjust build process #15

Triggered via pull request September 26, 2025 16:35
Status Failure
Total duration 2m 7s
Artifacts

unit-tests.yml

on: pull_request
Matrix: build-and-test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Java 11 (temurin)
Process completed with exit code 1.
Java 11 (zulu)
The operation was canceled.
Java 11 (zulu)
The strategy configuration was canceled because "build-and-test.temurin_11" failed
Java 8 (zulu)
The operation was canceled.
Java 8 (zulu)
The strategy configuration was canceled because "build-and-test.temurin_11" failed
Java 8 (temurin)
The operation was canceled.
Java 8 (temurin)
The strategy configuration was canceled because "build-and-test.temurin_11" failed
Java 17 (zulu)
The operation was canceled.
Java 17 (zulu)
The strategy configuration was canceled because "build-and-test.temurin_11" failed
Java 17 (temurin)
The operation was canceled.
Java 17 (temurin)
The strategy configuration was canceled because "build-and-test.temurin_11" failed