chore: Adjust build process #20
Triggered via pull request
September 26, 2025 17:12
Status
Failure
Total duration
2m 30s
Artifacts
–
Annotations
11 errors
|
Java 11 (zulu)
Process completed with exit code 1.
|
|
Java 8 (temurin)
Process completed with exit code 1.
|
|
Java 8 (temurin)
The strategy configuration was canceled because "build-and-test.zulu_11" failed
|
|
Java 17 (temurin)
The operation was canceled.
|
|
Java 17 (temurin)
The strategy configuration was canceled because "build-and-test.zulu_11" failed
|
|
Java 11 (temurin)
The operation was canceled.
|
|
Java 11 (temurin)
The strategy configuration was canceled because "build-and-test.zulu_11" failed
|
|
Java 8 (zulu)
The operation was canceled.
|
|
Java 8 (zulu)
The strategy configuration was canceled because "build-and-test.zulu_11" failed
|
|
Java 17 (zulu)
The operation was canceled.
|
|
Java 17 (zulu)
The strategy configuration was canceled because "build-and-test.zulu_11" failed
|