build(deps): bump golang.org/x/mod from 0.24.0 to 0.31.0 #1227
test.yaml
on: pull_request
Vet Go code
15s
Matrix: Test with Go
Matrix: Test with TinyGo
Matrix: Test with WebAssembly
Annotations
21 errors
|
Test with Go (1.24)
Process completed with exit code 1.
|
|
Test with Go (1.23)
The strategy configuration was canceled because "test-go._1_24" failed
|
|
Test with Go (1.23)
The operation was canceled.
|
|
Vet Go code
Process completed with exit code 1.
|
|
Test with TinyGo (1.24, 0.37.0)
Process completed with exit code 1.
|
|
Test with TinyGo (1.23, 0.37.0)
The strategy configuration was canceled because "test-tinygo._1_24_0_37_0" failed
|
|
Test with TinyGo (1.23, 0.37.0)
Process completed with exit code 1.
|
|
Test with WebAssembly (1.23, 0.36.0)
Process completed with exit code 2.
|
|
Test with WebAssembly (1.23, 0.35.0)
Process completed with exit code 2.
|
|
Test with WebAssembly (1.24, 0.36.0)
The strategy configuration was canceled because "test-wasm._1_23_0_35_0" failed
|
|
Test with WebAssembly (1.24, 0.36.0)
Process completed with exit code 2.
|
|
Test with TinyGo (1.23, 0.36.0)
The strategy configuration was canceled because "test-tinygo._1_24_0_37_0" failed
|
|
Test with TinyGo (1.23, 0.36.0)
Process completed with exit code 1.
|
|
Test with WebAssembly (1.24, 0.37.0)
The strategy configuration was canceled because "test-wasm._1_23_0_35_0" failed
|
|
Test with WebAssembly (1.24, 0.37.0)
Process completed with exit code 2.
|
|
Test with TinyGo (1.24, 0.36.0)
The strategy configuration was canceled because "test-tinygo._1_24_0_37_0" failed
|
|
Test with TinyGo (1.24, 0.36.0)
The operation was canceled.
|
|
Test with TinyGo (1.23, 0.35.0)
The strategy configuration was canceled because "test-tinygo._1_24_0_37_0" failed
|
|
Test with TinyGo (1.23, 0.35.0)
The operation was canceled.
|
|
Test with WebAssembly (1.23, 0.37.0)
The strategy configuration was canceled because "test-wasm._1_23_0_35_0" failed
|
|
Test with WebAssembly (1.23, 0.37.0)
The operation was canceled.
|