Skip to content

ci: Add 2 shards to the UBSAN / ASAN runs #705

ci: Add 2 shards to the UBSAN / ASAN runs

ci: Add 2 shards to the UBSAN / ASAN runs #705

Triggered via push December 7, 2025 14:07
Status Failure
Total duration 12m 15s
Artifacts

ci.yaml

on: push
Pre-build checks
12m 6s
Pre-build checks
Matrix: compile
Run fuzz regression tests
0s
Run fuzz regression tests
Matrix: Check we can downgrade the node
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
Update examples in doc schemas (disabled temporarily!)
0s
Update examples in doc schemas (disabled temporarily!)
CI completion
3s
CI completion
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Pre-build checks
Process completed with exit code 2.
CI completion
Process completed with exit code 1.