chore(deps-dev): bump semantic-release from 25.0.1 to 25.0.2 #170
test.yml
on: pull_request
tests
/
🧪 Linting
1m 15s
Matrix: tests / 🧪 Testing
tests
/
...
/
Auto-merge Dependabot PR
7s
Annotations
9 errors
|
tests / 🧪 Testing (3.12)
Process completed with exit code 1.
|
|
tests / 🧪 Testing (3.13)
The strategy configuration was canceled because "tests.test_matrix._3_12" failed
|
|
tests / 🧪 Testing (3.13)
The operation was canceled.
|
|
tests / 🧪 Testing (3.9)
The strategy configuration was canceled because "tests.test_matrix._3_12" failed
|
|
tests / 🧪 Testing (3.9)
The operation was canceled.
|
|
tests / 🧪 Testing (3.10)
The strategy configuration was canceled because "tests.test_matrix._3_12" failed
|
|
tests / 🧪 Testing (3.10)
The operation was canceled.
|
|
tests / 🧪 Testing (3.11)
The strategy configuration was canceled because "tests.test_matrix._3_12" failed
|
|
tests / 🧪 Testing (3.11)
The operation was canceled.
|