Skip to content

chore(deps-dev): bump semantic-release-replace-plugin #269

chore(deps-dev): bump semantic-release-replace-plugin

chore(deps-dev): bump semantic-release-replace-plugin #269

Triggered via push November 13, 2025 10:24
Status Failure
Total duration 1m 52s
Artifacts

release.yml

on: push
release  /  ...  /  🧪 Linting
1m 15s
release / tests / 🧪 Linting
Matrix: release / tests / 🧪 Testing
release  /  ...  /  Auto-merge Dependabot PR
release / tests / dependabot / Auto-merge Dependabot PR
release  /  Release @ ${{ vars.RTLDEV_MW_CI_OS }}
0s
release / Release @ ${{ vars.RTLDEV_MW_CI_OS }}
Fit to window
Zoom out
Zoom in

Annotations

9 errors
release / tests / 🧪 Testing (3.10)
Process completed with exit code 1.
release / tests / 🧪 Testing (3.11)
The strategy configuration was canceled because "release.tests.test_matrix._3_10" failed
release / tests / 🧪 Testing (3.11)
Process completed with exit code 1.
release / tests / 🧪 Testing (3.13)
The strategy configuration was canceled because "release.tests.test_matrix._3_10" failed
release / tests / 🧪 Testing (3.13)
The operation was canceled.
release / tests / 🧪 Testing (3.12)
The strategy configuration was canceled because "release.tests.test_matrix._3_10" failed
release / tests / 🧪 Testing (3.12)
The operation was canceled.
release / tests / 🧪 Testing (3.9)
The strategy configuration was canceled because "release.tests.test_matrix._3_10" failed
release / tests / 🧪 Testing (3.9)
The operation was canceled.