Skip to content

chore: gritty: v9.0.0 #36

chore: gritty: v9.0.0

chore: gritty: v9.0.0 #36

Triggered via push December 21, 2025 05:16
Status Failure
Total duration 29s
Artifacts

nodejs.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (20.x)
Process completed with exit code 1.
build (22.x)
The strategy configuration was canceled because "build._20_x" failed
build (22.x)
Process completed with exit code 1.
build (24.x)
The strategy configuration was canceled because "build._20_x" failed
build (24.x)
Process completed with exit code 1.
build (25.x)
The strategy configuration was canceled because "build._20_x" failed
build (25.x)
Process completed with exit code 1.