Skip to content

fix: package: node-pty (#microsoft/node-pty#845) #38

fix: package: node-pty (#microsoft/node-pty#845)

fix: package: node-pty (#microsoft/node-pty#845) #38

Triggered via push December 24, 2025 12:35
Status Failure
Total duration 34s
Artifacts

nodejs.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (22.x)
Process completed with exit code 1.
build (24.x)
The strategy configuration was canceled because "build._22_x" failed
build (24.x)
Process completed with exit code 1.
build (20.x)
The strategy configuration was canceled because "build._22_x" failed
build (20.x)
The operation was canceled.
build (25.x)
The strategy configuration was canceled because "build._22_x" failed
build (25.x)
The operation was canceled.