Skip to content

chore: gritty: v10.0.1 #51

chore: gritty: v10.0.1

chore: gritty: v10.0.1 #51

Triggered via push February 12, 2026 11:48
Status Failure
Total duration 21s
Artifacts

nodejs.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (24.x)
Process completed with exit code 1.
build (25.x)
The strategy configuration was canceled because "build._24_x" failed
build (25.x)
The operation was canceled.
build (22.x)
The strategy configuration was canceled because "build._24_x" failed
build (22.x)
The operation was canceled.