Skip to content

Add vital and db connection metrics for clock and deployment updater #7998

Add vital and db connection metrics for clock and deployment updater

Add vital and db connection metrics for clock and deployment updater #7998

Triggered via pull request December 18, 2025 09:18
Status Failure
Total duration 23m 58s
Artifacts

unit_tests.yml

on: pull_request
Matrix: Test-Mysql
Matrix: Test-Postgres
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
Test-Postgres (postgres:15)
Process completed with exit code 1.
Test-Postgres (postgres:13)
Process completed with exit code 1.
Test-Postgres (postgres:17)
Process completed with exit code 1.
Test-Mysql (mysql:8.0)
Process completed with exit code 1.
Test-Mysql (mysql:8.2)
Process completed with exit code 1.
Rubocop
Back off 15.707 seconds before retry.
Rubocop
Failed to download action 'https://api.github.com/repos/hmarr/debug-action/tarball/f7318c783045ac39ed9bb497e22ce835fdafbfe6'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.