Skip to content

chore(deps): update astral-sh/setup-uv action to v7 #1069

chore(deps): update astral-sh/setup-uv action to v7

chore(deps): update astral-sh/setup-uv action to v7 #1069

Triggered via pull request January 6, 2026 20:37
@renovaterenovate[bot]
synchronize #129
Status Failure
Total duration 1m 11s
Artifacts

test.yml

on: pull_request_target
access-check
3s
access-check
parse-tests
0s
parse-tests
integration-tests
54s
integration-tests
Matrix: codemod-tests
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

16 errors
unit-tests (1)
Process completed with exit code 4.
unit-tests (7)
The strategy configuration was canceled because "unit-tests._1" failed
unit-tests (7)
Process completed with exit code 4.
integration-tests
Process completed with exit code 4.
unit-tests (5)
The strategy configuration was canceled because "unit-tests._1" failed
unit-tests (5)
The operation was canceled.
unit-tests (6)
The strategy configuration was canceled because "unit-tests._1" failed
unit-tests (6)
The operation was canceled.
unit-tests (3)
The strategy configuration was canceled because "unit-tests._1" failed
unit-tests (3)
The operation was canceled.
unit-tests (4)
The strategy configuration was canceled because "unit-tests._1" failed
unit-tests (4)
The operation was canceled.
unit-tests (2)
The strategy configuration was canceled because "unit-tests._1" failed
unit-tests (2)
The operation was canceled.
unit-tests (8)
The strategy configuration was canceled because "unit-tests._1" failed
unit-tests (8)
The operation was canceled.