chore(deps): update astral-sh/setup-uv action to v7 #1069
Triggered via pull request
January 6, 2026 20:37
renovate[bot]
synchronize
#129
Status
Failure
Total duration
1m 11s
Artifacts
–
test.yml
on: pull_request_target
access-check
3s
Matrix: codemod-tests
Matrix: unit-tests
Annotations
16 errors
|
unit-tests (1)
Process completed with exit code 4.
|
|
unit-tests (7)
The strategy configuration was canceled because "unit-tests._1" failed
|
|
unit-tests (7)
Process completed with exit code 4.
|
|
integration-tests
Process completed with exit code 4.
|
|
unit-tests (5)
The strategy configuration was canceled because "unit-tests._1" failed
|
|
unit-tests (5)
The operation was canceled.
|
|
unit-tests (6)
The strategy configuration was canceled because "unit-tests._1" failed
|
|
unit-tests (6)
The operation was canceled.
|
|
unit-tests (3)
The strategy configuration was canceled because "unit-tests._1" failed
|
|
unit-tests (3)
The operation was canceled.
|
|
unit-tests (4)
The strategy configuration was canceled because "unit-tests._1" failed
|
|
unit-tests (4)
The operation was canceled.
|
|
unit-tests (2)
The strategy configuration was canceled because "unit-tests._1" failed
|
|
unit-tests (2)
The operation was canceled.
|
|
unit-tests (8)
The strategy configuration was canceled because "unit-tests._1" failed
|
|
unit-tests (8)
The operation was canceled.
|