Skip to content

chore(deps): update dependency astral-sh/uv to v0.9.30 #1072

chore(deps): update dependency astral-sh/uv to v0.9.30

chore(deps): update dependency astral-sh/uv to v0.9.30 #1072

Triggered via pull request January 14, 2026 00:31
@renovaterenovate[bot]
synchronize #135
Status Failure
Total duration 45s
Artifacts

test.yml

on: pull_request_target
access-check
4s
access-check
parse-tests
0s
parse-tests
integration-tests
28s
integration-tests
Matrix: codemod-tests
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

15 errors
integration-tests
Process completed with exit code 4.
unit-tests (2)
Process completed with exit code 4.
unit-tests (1)
Process completed with exit code 4.
unit-tests (5)
The strategy configuration was canceled because "unit-tests._2" failed
unit-tests (5)
Process completed with exit code 4.
unit-tests (4)
The strategy configuration was canceled because "unit-tests._2" failed
unit-tests (4)
Process completed with exit code 4.
unit-tests (8)
The strategy configuration was canceled because "unit-tests._2" failed
unit-tests (8)
Process completed with exit code 4.
unit-tests (6)
The strategy configuration was canceled because "unit-tests._2" failed
unit-tests (6)
The operation was canceled.
unit-tests (3)
The strategy configuration was canceled because "unit-tests._2" failed
unit-tests (3)
The operation was canceled.
unit-tests (7)
The strategy configuration was canceled because "unit-tests._2" failed
unit-tests (7)
The operation was canceled.