Skip to content

chore: @putout/plugin-variables: v1.6.0 #8550

chore: @putout/plugin-variables: v1.6.0

chore: @putout/plugin-variables: v1.6.0 #8550

Triggered via push December 27, 2025 10:38
Status Failure
Total duration 5m 52s
Artifacts

nodejs.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (25.x)
Process completed with exit code 1.
build (24.x)
The strategy configuration was canceled because "build._25_x" failed
build (24.x)
The operation was canceled.
build (20.x)
The strategy configuration was canceled because "build._25_x" failed
build (20.x)
The operation was canceled.
build (22.x)
The strategy configuration was canceled because "build._25_x" failed
build (22.x)
The operation was canceled.