Skip to content

chore: putout: v41.2.3 #8634

chore: putout: v41.2.3

chore: putout: v41.2.3 #8634

Triggered via push December 30, 2025 22:10
Status Failure
Total duration 7m 38s
Artifacts

nodejs.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (25.x)
Process completed with exit code 1.
build (25.x): packages/plugin-new/eslint.config.js#L1
"eslint-plugin-putout" is extraneous.
build (20.x)
The strategy configuration was canceled because "build._25_x" failed
build (20.x)
The operation was canceled.
build (22.x)
The strategy configuration was canceled because "build._25_x" failed
build (22.x)
The operation was canceled.
build (24.x)
The strategy configuration was canceled because "build._25_x" failed
build (24.x)
The operation was canceled.