Skip to content

Potential calculation error by MibS #151

@Julius2627

Description

@Julius2627

Dear MibS developer team,
after checking the results for a particular problem instance multiple times, I believe that MibS may be producing an incorrect solution. Specifically, it seems that the lower-level problem is not being optimally solved for the returned upper-level solution, which results in a solution that is not bilevel-feasible.

I have attached the corresponding MPS and AUX files (both old and new format). In my assessment, the optimal objective value should be 32, but MibS returns 31.

Do you have any idea what might be causing this issue? If necessary, I can also provide the mathematical model as a PDF along with the parameter values.

Kind regards
Julius

modell_auxOldFormat.txt

modell_auxNewFormat.txt
modell_mps.txt

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions