The code of the calendar tile was copied from the calendar portlet and it depends on the portal_calendar tool; this tools was removed in Plone 5:
https://travis-ci.org/collective/collective.cover/jobs/141693521#L1392
We need to refactor this part of the code to allow compatibility.
Some ideas can be taken from #600.