Skip to content

chore: update uv.lock #27

chore: update uv.lock

chore: update uv.lock #27

Triggered via push May 25, 2025 15:02
Status Failure
Total duration 18s
Artifacts
Matrix: test-and-lint
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test-and-lint (3.11)
The process '/opt/hostedtoolcache/ruff/0.11.11/x86_64/ruff' failed with exit code 1
test-and-lint (3.9)
The process '/opt/hostedtoolcache/ruff/0.11.11/x86_64/ruff' failed with exit code 1
test-and-lint (3.9)
The strategy configuration was canceled because "test-and-lint._3_11" failed
test-and-lint (3.10)
The process '/opt/hostedtoolcache/ruff/0.11.11/x86_64/ruff' failed with exit code 1
test-and-lint (3.10)
The strategy configuration was canceled because "test-and-lint._3_11" failed