Add CLI enhancements: -c/--command, -f/--file, -y/--yes flags and .pgpass SSH tunnel support #499
Annotations
9 errors
|
build (3.13)
Process completed with exit code 1.
|
|
build (3.9)
The strategy configuration was canceled because "build._3_13" failed
|
|
build (3.9)
The operation was canceled.
|
|
build (3.11)
The strategy configuration was canceled because "build._3_13" failed
|
|
build (3.11)
The operation was canceled.
|
|
build (3.10)
The strategy configuration was canceled because "build._3_13" failed
|
|
build (3.10)
The operation was canceled.
|
|
build (3.12)
The strategy configuration was canceled because "build._3_13" failed
|
|
build (3.12)
The operation was canceled.
|