vertx-virtual-threads (4.x) #258
ci-4.x.yml
on: schedule
Matrix: CI
Deploy
/
Deploy to OSSRH
Annotations
4 errors
|
CI (ubuntu-latest, 21) / Run tests
Process completed with exit code 1.
|
|
CI (windows-latest, 21) / Run tests
The operation was canceled.
|
|
CI (windows-latest, 21) / Run tests
The strategy configuration was canceled because "CI.ubuntu-latest_21" failed
|
|
vertx-virtual-threads (4.x)
The strategy configuration was canceled because "CI.ubuntu-latest_21" failed
|