Skip to content

Bump actions/attest-build-provenance from 1 to 2 (#14042) #10909

Bump actions/attest-build-provenance from 1 to 2 (#14042)

Bump actions/attest-build-provenance from 1 to 2 (#14042) #10909

Triggered via push December 10, 2024 10:51
Status Failure
Total duration 6m 20s
Artifacts

ci.yml

on: push
Check POSIX-compliant
11s
Check POSIX-compliant
Matrix: test_linux
Matrix: test_windows
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Ubuntu 24.04, Erlang/OTP master
Could not install Erlang/OTP master from any hex.pm mirror
Windows Server 2019, Erlang/OTP 27.1
Process completed with exit code 1.
Windows Server 2019, Erlang/OTP 26.2
The job was canceled because "_27_1" failed.
Windows Server 2019, Erlang/OTP 25.3
The job was canceled because "_27_1" failed.
Windows Server 2019, Erlang/OTP 25.3
The operation was canceled.