Skip to content

Release v1.18.3

Release v1.18.3 #11709

Triggered via push March 6, 2025 10:04
Status Failure
Total duration 5m 50s
Artifacts

ci.yml

on: push
Check POSIX-compliant
11s
Check POSIX-compliant
Matrix: test_linux
Matrix: test_windows
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Ubuntu 24.04, Erlang/OTP master
Process completed with exit code 2.
Windows Server 2019, Erlang/OTP 27.1
Process completed with exit code 1.
Windows Server 2019, Erlang/OTP 26.2
The job was canceled because "_27_1" failed.
Windows Server 2019, Erlang/OTP 26.2
The operation was canceled.
Windows Server 2019, Erlang/OTP 25.3
The job was canceled because "_27_1" failed.
Windows Server 2019, Erlang/OTP 25.3
The operation was canceled.