Clarify and link to config modules, closes #14533 #860
release.yml
on: push
Matrix: Build Elixir
create_draft_release
26s
Matrix: sign
upload-builds-hex-pm
upload-release
0s
Annotations
4 errors and 6 warnings
|
create_draft_release
Process completed with exit code 1.
|
|
Build Elixir (27, 27.0)
Response status code does not indicate success: 504 (Gateway Timeout).
|
|
Build Elixir (28, 28.0, build_docs)
The operation was canceled.
|
|
Build Elixir (28, 28.0, build_docs)
The strategy configuration was canceled because "build._27_27_0" failed
|
|
Build Elixir (27, 27.0)
Back off 25.99 seconds before retry.
|
|
Build Elixir (27, 27.0)
Failed to download action 'https://api.github.com/repos/erlef/setup-beam/tarball/5304e04ea2b355f03681464e683d92e3b2f18451'. Error: Response status code does not indicate success: 429 (Too Many Requests). B800:1F4F7A:8823A:BED17:68342357
|
|
Build Elixir (27, 27.0)
Back off 20.764 seconds before retry.
|
|
Build Elixir (27, 27.0)
Failed to download action 'https://api.github.com/repos/erlef/setup-beam/tarball/5304e04ea2b355f03681464e683d92e3b2f18451'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
|
Build Elixir (28, 28.0, build_docs)
Back off 24.519 seconds before retry.
|
|
Build Elixir (28, 28.0, build_docs)
Failed to download action 'https://api.github.com/repos/erlef/setup-beam/tarball/5304e04ea2b355f03681464e683d92e3b2f18451'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
build-linux-elixir-otp-26
Expired
|
7.7 MB |
sha256:c4a6bbcb9fd4fa9318a33ee93b029d257a22ada2849646a916cb85cf229b617b
|
|
|
build-windows-elixir-otp-26
Expired
|
7.77 MB |
sha256:b462b40216b4cf915a9d12e648d9e91c06973c1c73bf08772bf84c490ea717f0
|
|