Skip to content

chore(deps): bump @adonisjs/http-server from 7.8.0 to 8.0.0 #785

chore(deps): bump @adonisjs/http-server from 7.8.0 to 8.0.0

chore(deps): bump @adonisjs/http-server from 7.8.0 to 8.0.0 #785

Triggered via pull request March 1, 2026 18:23
Status Failure
Total duration 37s
Artifacts

ci.yml

on: pull_request
Matrix: Test
Dependency Review
7s
Dependency Review
Automerge Dependabot PRs
0s
Automerge Dependabot PRs
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Test (20)
Process completed with exit code 1.
Test (24)
The strategy configuration was canceled because "test._20" failed
Test (22)
The strategy configuration was canceled because "test._20" failed
Test (22)
The operation was canceled.