[CDTOOL-895] - Support for Image Optimizer Settings #4267
pr_test.yml
on: pull_request
config
37s
changelog
5s
docker-builds
51s
lint
1m 14s
Matrix: test
Annotations
6 errors and 2 notices
|
test (0.31.2, 1.24.x, 18, ubuntu-latest)
Process completed with exit code 2.
|
|
test (0.31.2, 1.24.x, 18, windows-latest)
The operation was canceled.
|
|
test (0.31.2, 1.24.x, 18, windows-latest)
The strategy configuration was canceled because "test._0_31_2_1_24_x_18_ubuntu-" failed
|
|
test (0.31.2, 1.24.x, 18, macos-latest)
The operation was canceled.
|
|
test (0.31.2, 1.24.x, 18, macos-latest)
The strategy configuration was canceled because "test._0_31_2_1_24_x_18_ubuntu-" failed
|
|
Test
Canceling since a higher priority waiting request for 1518/merge exists
|
|
test (0.31.2, 1.24.x, 18, windows-latest)
The windows-latest label will migrate from Windows Server 2022 to Windows Server 2025 beginning September 2, 2025. For more information see https://github.com/actions/runner-images/issues/12677
|
|
test (0.31.2, 1.24.x, 18, macos-latest)
The macos-latest label will migrate to macOS 15 beginning August 4, 2025. For more information see https://github.com/actions/runner-images/issues/12520
|