Skip to content

chore(deps): update dependency @cucumber/cucumber to v12 (master) #7661

chore(deps): update dependency @cucumber/cucumber to v12 (master)

chore(deps): update dependency @cucumber/cucumber to v12 (master) #7661

Triggered via pull request March 9, 2026 05:49
Status Failure
Total duration 11m 37s
Artifacts

node-ci.yml

on: pull_request
Matrix: verify-matrix
workflow-result
3s
workflow-result
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

5 errors
verify-matrix (20.9.0)
The strategy configuration was canceled because "verify-matrix._18_19_0" failed
verify-matrix (18.19.0)
Process completed with exit code 1.
verify-matrix (22.11.0)
The strategy configuration was canceled because "verify-matrix._18_19_0" failed
verify-matrix (24)
The strategy configuration was canceled because "verify-matrix._18_19_0" failed
workflow-result
Process completed with exit code 1.