Skip to content

chore(deps): lock file maintenance #7573

chore(deps): lock file maintenance

chore(deps): lock file maintenance #7573

Triggered via push March 9, 2026 08:53
Status Failure
Total duration 54s
Artifacts

node-ci.yml

on: push
Matrix: verify-matrix
workflow-result
3s
workflow-result
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

6 errors
verify-matrix (20.6.1)
Process completed with exit code 1.
verify-matrix (22)
The strategy configuration was canceled because "verify-matrix._20_6_1" failed
verify-matrix (22)
The operation was canceled.
verify-matrix (18.17.0)
The strategy configuration was canceled because "verify-matrix._20_6_1" failed
verify-matrix (18.17.0)
The operation was canceled.
workflow-result
Process completed with exit code 1.