feat: lora for accelerated MoE #606
format.yml
on: pull_request
sample-config
7s
Matrix: lint
Annotations
9 errors
|
lint (accelerated-moe)
Process completed with exit code 24.
|
|
lint (framework)
The job was canceled because "accelerated-moe" failed.
|
|
lint (framework)
The operation was canceled.
|
|
lint (attention-and-distributed-packing)
The job was canceled because "accelerated-moe" failed.
|
|
lint (attention-and-distributed-packing)
The operation was canceled.
|
|
lint (fused-ops-and-kernels)
The job was canceled because "accelerated-moe" failed.
|
|
lint (fused-ops-and-kernels)
The operation was canceled.
|
|
lint (accelerated-peft)
The job was canceled because "accelerated-moe" failed.
|
|
lint (accelerated-peft)
The operation was canceled.
|