Skip to content

Latest commit

 

History

History
58 lines (42 loc) · 3.09 KB

File metadata and controls

58 lines (42 loc) · 3.09 KB

COSMOS

a network of distributed ledgers

Cosmos is a project with an ambitious mission -- to create a network of distributed ledgers that solve long-standing problems in the cryptocurrency and blockchain space.

Cosmos is a network of independent parallel blockchains that are each powered by classical BFT consensus algorithms like Tendermint 1. The first blockchain in this network will be the Cosmos Hub. The Cosomos Hub connects to many other blockchains (or zones) via a novel inter-blockchain communication protocol. The Cosmos Hub tracks numerous token types, and keeps record of the total number of tokens in each connected zone. Tokens can be transferred from one zone to another, securely and quickly, without the need for a liquid exchange between zones, because all inter-zone coin transfers go through the Cosmos Hub.

This architecture solves so many problems that the blockchain space faces today, including application interoperability, scalability, and seamless upgradability. For example, zones derived from Bitcoind, Go-Ethereum, CryptoNote, ZCash, or any blockchain system can be plugged into the Cosmos Hub. These zones allow Cosmos to scale infinitely to meet global transaction demand. And, zones are a great fit for a distributed exchange, which will be supported as well.

Cosmos is not just a single distributed ledger, and the Cosmos Hub isn't a walled garden or the center of its universe. We are designing a protocol for an open network of distributed legers that can serve as a new foundation for our future financial systems, based on principles of cryptography, sound economics, consensus theory, transparency, and accountability.

A Cosmos zone is a distributed ledger, or blockchain. Each zone can have different transaction logic and economic/governance/security policies.

We've developed a trick that allows zones to communicate with each other directly. It's based on classical BFT algorithms, like Tendermint.

With this technique, we could make Ethereum scale by constructing a common hub blockchain. All inter-zone token movements would go through the hub.

Upgrading the EVM would be seamless, with less risk of contentious hard-forks. Anyone could plug in a better, upgraded smart contract system.

We could import other blockchains and have a distributed exchange on its own zone. This could be strictly more secure than centralized exchanges.

The Cosmos hub isn't the center of the universe. Any zone can be a hub.