Skip to content

Poc

Poc #13

Triggered via pull request June 9, 2025 23:47
@GrantBirkiGrantBirki
synchronize #2
poc
Status Failure
Total duration 16s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

19 errors
test (3.4.3)
Process completed with exit code 1.
test (3.3.0)
Process completed with exit code 1.
test (3.3.0)
The strategy configuration was canceled because "test._3_4_3" failed
test (3.1.2)
Process completed with exit code 1.
test (3.1.2)
The strategy configuration was canceled because "test._3_4_3" failed
test (3.3.1)
The operation was canceled.
test (3.3.1)
The strategy configuration was canceled because "test._3_4_3" failed
test (3.4.2)
The operation was canceled.
test (3.4.2)
The strategy configuration was canceled because "test._3_4_3" failed
test (3.2.3)
The operation was canceled.
test (3.2.3)
The strategy configuration was canceled because "test._3_4_3" failed
test (3.4.0)
The operation was canceled.
test (3.4.0)
The strategy configuration was canceled because "test._3_4_3" failed
test (3.2.2)
The operation was canceled.
test (3.1.4)
The operation was canceled.
test (3.2.2)
The strategy configuration was canceled because "test._3_4_3" failed
test (3.1.4)
The strategy configuration was canceled because "test._3_4_3" failed
test (3.4.4)
The operation was canceled.
test (3.4.4)
The strategy configuration was canceled because "test._3_4_3" failed