Skip to content

upgrade Bazel protobuf to 33.1 #10945

upgrade Bazel protobuf to 33.1

upgrade Bazel protobuf to 33.1 #10945

Triggered via pull request December 5, 2025 23:41
Status Failure
Total duration 13m 14s
Artifacts

testing.yml

on: pull_request
Matrix: bazel
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

3 errors
bazel (false)
Process completed with exit code 1.
bazel (true)
The strategy configuration was canceled because "bazel.false" failed
bazel (true)
The operation was canceled.