generated from hackforla/.github-hackforla-base-repo-template
-
-
Notifications
You must be signed in to change notification settings - Fork 44
Open
Labels
bugRelease Note: Shows as Error CorrectionRelease Note: Shows as Error Correctiondeck: staginglevel: easyp-feature: My Projects/projects/projectspriority: MUST HAVErole: front-endFront End DeveloperFront End Developersize: 0.5ptCan be done in 2-3 hours or lessCan be done in 2-3 hours or lesstime sensitive
Milestone
Description
Describe the bug
The spacing of the filter icons for each column on the My Projects page is incorrect/inconsistent with the Manage Submissions and Submissions pages.
Details
The new layout should be the following, where M is a space.
if there is a filter applied
{column name}M{sort}M{filter}
if there is no filter applied
{column name}M{filter}
This issue is labeled as time sensitive only because it affects user testing.
Steps to Reproduce
- Log in as Admin to dev
- Go to the My Projects page
- Open the Manage Submissions page in a new tab
- Notice how the filter icons appear after a larger gap in the Project Name column on the My Projects page as compared to the Manage Submissions page
Actual Result
Expected Result
The filter icon for all column names on all pages should appear after a standard gap.
Action Items
- Fix bug.
- Review with development lead.
- Review with product, development, and research teams. Update if needed based on feedback.
- Once finalized, add a slide to the staging deck (see resources)
- Get Stakeholder sign-off via the stakeholder meeting slide deck.
Resources/Instructions
Staging and Release decks
- Staging Deck
- Release Deck
- [2025-MM-DD Release deck, slide ISSUE NUMBER]
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
bugRelease Note: Shows as Error CorrectionRelease Note: Shows as Error Correctiondeck: staginglevel: easyp-feature: My Projects/projects/projectspriority: MUST HAVErole: front-endFront End DeveloperFront End Developersize: 0.5ptCan be done in 2-3 hours or lessCan be done in 2-3 hours or lesstime sensitive
Type
Projects
Status
Technical Review
