Skip to content

Bump org.quartz-scheduler:quartz from 2.3.2 to 2.5.2 #40

Bump org.quartz-scheduler:quartz from 2.3.2 to 2.5.2

Bump org.quartz-scheduler:quartz from 2.3.2 to 2.5.2 #40

Triggered via push December 12, 2025 20:52
Status Failure
Total duration 15m 15s
Artifacts

build.yml

on: push
build  /  select_java
4s
build / select_java
Matrix: build / build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build / build (11)
Process completed with exit code 1.
build / build (8)
The strategy configuration was canceled because "build.build._11" failed
build / build (8)
Process completed with exit code 1.
build / build (17)
The strategy configuration was canceled because "build.build._11" failed
build / build (17)
The operation was canceled.