Skip to content

rustls-libssl

rustls-libssl #17

Triggered via schedule February 16, 2026 13:38
Status Failure
Total duration 1m 19s
Artifacts

libssl.yaml

on: schedule
Matrix: Build+test
Matrix: Produce release packages
Fit to window
Zoom out
Zoom in

Annotations

22 errors
Clippy
Process completed with exit code 101.
MSRV
Process completed with exit code 101.
Format
Process completed with exit code 1.
Clippy nightly (optional)
Process completed with exit code 101.
Build+test (beta, ubuntu-latest)
Process completed with exit code 2.
Build+test (nightly, ubuntu-22.04)
The strategy configuration was canceled because "build.beta_ubuntu-latest" failed
Build+test (nightly, ubuntu-22.04)
Process completed with exit code 2.
Build+test (stable, ubuntu-latest)
The strategy configuration was canceled because "build.beta_ubuntu-latest" failed
Build+test (stable, ubuntu-latest)
The operation was canceled.
Build+test (beta, ubuntu-22.04)
The strategy configuration was canceled because "build.beta_ubuntu-latest" failed
Build+test (beta, ubuntu-22.04)
The operation was canceled.
Build+test (nightly, ubuntu-latest)
The strategy configuration was canceled because "build.beta_ubuntu-latest" failed
Build+test (nightly, ubuntu-latest)
Process completed with exit code 2.
Build+test (stable, ubuntu-22.04)
The strategy configuration was canceled because "build.beta_ubuntu-latest" failed
Build+test (stable, ubuntu-22.04)
The operation was canceled.
Check for documentation errors
Process completed with exit code 101.
Packaging
Process completed with exit code 2.
Valgrind
Process completed with exit code 2.
Miri
Process completed with exit code 101.
Produce release packages (ubuntu, 24.04, deb)
Process completed with exit code 2.
Produce release packages (fedora, 40, rpm)
The strategy configuration was canceled because "release_packages.ubuntu_24_04_deb" failed
Produce release packages (fedora, 40, rpm)
The operation was canceled.