rustls-libssl #60
libssl.yaml
on: schedule
Valgrind
26s
Check for documentation errors
25s
Format
7s
MSRV
15s
Clippy
7s
Clippy nightly (optional)
14s
Clang Tidy
14s
Miri
40s
Packaging
35s
Matrix: Build+test
Matrix: Produce release packages
Annotations
22 errors
|
Format
Process completed with exit code 1.
|
|
Clippy
Process completed with exit code 101.
|
|
Clippy nightly (optional)
Process completed with exit code 101.
|
|
MSRV
Process completed with exit code 101.
|
|
Build+test (stable, ubuntu-22.04)
Process completed with exit code 2.
|
|
Check for documentation errors
Process completed with exit code 101.
|
|
Build+test (beta, ubuntu-22.04)
The strategy configuration was canceled because "build.stable_ubuntu-22_04" failed
|
|
Build+test (beta, ubuntu-22.04)
The operation was canceled.
|
|
Build+test (beta, ubuntu-latest)
The strategy configuration was canceled because "build.stable_ubuntu-22_04" failed
|
|
Build+test (beta, ubuntu-latest)
The operation was canceled.
|
|
Build+test (nightly, ubuntu-latest)
The strategy configuration was canceled because "build.stable_ubuntu-22_04" failed
|
|
Build+test (nightly, ubuntu-latest)
The operation was canceled.
|
|
Valgrind
Process completed with exit code 2.
|
|
Build+test (stable, ubuntu-latest)
The strategy configuration was canceled because "build.stable_ubuntu-22_04" failed
|
|
Build+test (stable, ubuntu-latest)
The operation was canceled.
|
|
Build+test (nightly, ubuntu-22.04)
The strategy configuration was canceled because "build.stable_ubuntu-22_04" failed
|
|
Build+test (nightly, ubuntu-22.04)
The operation was canceled.
|
|
Packaging
Process completed with exit code 2.
|
|
Miri
Process completed with exit code 101.
|
|
Produce release packages (ubuntu, 24.04, deb)
Process completed with exit code 2.
|
|
Produce release packages (fedora, 40, rpm)
The strategy configuration was canceled because "release_packages.ubuntu_24_04_deb" failed
|
|
Produce release packages (fedora, 40, rpm)
The operation was canceled.
|